Invitation to Bid for Rehabilitation of Water Gate Structure (1 set), and Rehabilitation of Canals (3 set)

with EBA Asia Project, NCSD/Ministry of Environment

BTDC-ID: 23710

Closing Date:

Announcement Description

The National Council of Sustainable Development (NCSD) is implementing a project named “Building climate resilience of urban systems through Ecosystem-based Adaptation in the Asia-Pacific Region (EbA)”, which is funded by Global Environmental Programme (GEF) through United Nations Environment Program (UNEP). There are three project’s main outcomes: i) the strengthening of institutional capacity and capacity-building within city management authorities in pilot cities to plan and implement urban EbA; ii) the demonstration of EbA in pilot cities to reduce the vulnerability of poor, urban communities; and iii) the strengthening of the knowledge base for supporting the design of urban EbA interventions and an increase in public awareness of the positive potential of urban EbA interventions to reduce vulnerability to climate change impacts. It is structured around the following three components:

Component 1: Institutional strengthening and capacity building of city management authorities in pilot cities to plan and implement urban EbA;

Component 2: Demonstrating urban EbA interventions in pilot cities; and

Component 3: Disseminating knowledge and raising public awareness on urban EbA in pilot cities.

Expected Outputs

Invitation to Bid for Rehabilitation of Water Gate Structure (1 set), and Rehabilitation of Canals (3 set)

  • Category: Invitation for Bids
  • Location: Phnom Penh
Summary

The EbA project now invites sealed bids from the eligible and qualified bidders for:

Rehabilitation of water gate structure, 4mx6m

  • Demolish all upper existing concrete columns,mx1.5mx3m= 1 set
  • Replace the new water gate culvert, repairing by ensuring it is functional= 2 psc
  • Demolish all handrails and replace them with new handrail, 12m=12 m
  • Prepare stone pavement preventing soil settlement= 19 m
  • Installing Solar Street Light and Poles= 20 sets
  • Environmental and Social Safeguard= Lump Sum

Rehabilitation of canal, 2742m

  • Demolish existing flood prevention system and build new flood prevention system, 7.5m x1.3mx1m= 1 set
  • Do the excavation of the canal, 2mx4mx1.5m= 2742 m
  • water gates at different points of the canal= 3 set
  • Demolish the old sewer system and prepare a new sewer system, 1mx7m= 3 sets
  • Install solar Street Light and Poles= 85 sets
  • Plant trees along the canal= 1 set
  • Environmental and Social Safeguard= Lump Sum

Rehabilitation of canal, 1058m

  • Do the excavation of the canal, 2mx4mx1.5m= 1058 m
  • Construct water gates at different points of the canal= 2 sets
  • Install Solar Street Light and Poles= 20 sets
  • Plant trees along the canal= Lump Sum
  • Environmental and Social Safeguard= Lump Sum

Rehabilitation of canal, 4659 m

  • Do the excavation of the canal, 2mx4mx1.5m= 4659 m
  • Construct water gates at different points of the canal= 3 sets
  • Install Solar Street Light and Poles = 150 sets
  • Plant trees along the canal= 280 units
  • Environmental and Social Safeguard= Lump Sum

Submission Requirements

Interested qualified eligible bidders are invited to submit a sealed envelope of completed bidding documents which are available to download a softcopy as in the link or contact the Department of Climate Change with the requirement document as following.

A project sheet could be provided upon the bidder’s request.

Bids must be delivered to the address provided in the contact details at or before 05:00 pm on 30th April 2023.

Attachment:
 

Contact Details

Office Address
  •  c/o Ministry of Environment (MoE), Morodok Techo Building, Lot 503, Sangkat Tonle Basak, Khan Chamkar Mon, Phnom Penh, Cambodia
 
Contact Name
  •  ​​​The Department of Climate Change (DCC), c/o Ministry of Environment (MoE),
 
Phone
 
Email
 
Website