Call For Application: Support on Issuance of Infrastructure Project Bond Issuance
- Career Category: Call for Proposals
- Location: Phnom Penh
CFA Number: CFA25-053
Project Name: Increase of Infrastructure Bond Issuance Through Issuance Support
Domain Name: Infrastructure
Program Duration: November 2025 – June 2027
2. CAPRED’s potential support package
CAPRED will provide financial support to reduce the issuance costs of infrastructure project bonds.
- For bond issuance size of USD50 million and above,
- Up to 25% of total issuance costs
- USD10,000 for roadshows to reach untapped markets for Cambodia's securities (e.g., Australia, US, EU, etc.)
- Maximum grant of both support is USD150,000 per bond issuance.
- For bond issuance size between USD10 million to below USD50 million,
- Up to 50% of total issuance costs
- USD10,000 for roadshows to reach untapped markets for Cambodia's securities (e.g., Australia, US, EU, etc.)
- Maximum grant of both support is USD150,000 per bond issuance.
Note:
- Issuance costs refer to all costs required by a bond issuer to be able to issue a bond. These cost items include but are not limited to: 1. legal fees, 2. technical and ESG due diligence fees, 3. financial due diligence fees, 4. Registration fee at Securities and Exchange Regulator of Cambodia (SERC), 5. listing eligibility review fee by Cambodia Stock Exchange (CSX), 6. securities depository fee at CSX, 7. securities registrar fee, 8. guarantor fee, 9. underwriter/lead manager fee, 10. credit rating fee, etc.
- Roadshow costs include all costs required for necessary personnel's flights, accommodation, meeting arrangements, etc.
3. Eligibility Criteria
3.1 Types of infrastructure projects
Types of infrastructure projects suitable for CAPRED support for infrastructure project bond issuance include:
- Renewable energy:
- Solar energy
- Wind energy
- Battery energy storage system
- Special Economic Zone
- Agro Industrial Pak
- Water projects including water supply, wastewater and water security enhancement
- Telecommunication
3.2 Status of the infrastructure projects
3.3 Documentation requirements
Please click the Attachment below for more information.